Official site of the Pereslavl Narrow-Gauge Railway Museum
Main • Museum • Visiting • Events • Links • Contacts Russian version

September 14, 2009. Ft4-028 assembly begins

After hydraulic test the assembly of the locomotive began. The boiler and firebox were thoroughly cleaned and covered with temperature-resistant primer and paint. The boiler insulation was completely replaced by the new asbestos-free material, boiler cladding repaired and installed in place.

Priming of the frames.

Photo by Dmitry Sutyagin

 

Painting of the frames.

Photo by Dmitry Sutyagin

 

Firebox covered with insulation material.

Photo by Dmitry Sutyagin

 

Installation of the boiler cover plates.

Photo by Dmitry Sutyagin

 

Boiler cover plates in place.

Photo by Sergei Dorozhkov

 

If you find an error
If you find an error on our website please highlight it then press Ctrl-Enter and the message will be sent to our web-master

If you find factual mistakes in the text, please e-mail us at info@kukushka.ru

 
Main • Museum • Visiting • Events • Links • Contacts Russian version
Система Orphus